Sentinel Completions — Commissioning Lifecycle Management Platform

Sentinel Completions commissioning management platform
The Platform

Why Sentinel?

Commissioning success depends on having the right information at the right time. Sentinel delivers real-time visibility of system readiness, completion status, outstanding punch items, and commissioning progress, allowing project teams to focus on execution rather than searching for information. The platform serves as a single source of truth for all stakeholders involved in project delivery.

Industrial control room operations
Platform Value

Sentinel Application Strong Value

Visibility

Gain complete visibility across every system, discipline, and commissioning phase from a single platform.

Readiness

Know exactly which systems are ready for Mechanical Completion, Commissioning, RFSU, and Handover.

Traceability

Every inspection, punch item, approval, and certificate is fully traceable and auditable.

Control

Transform commissioning from a reactive process into a controlled and measurable operation.

Collaboration

Eliminate information silos by connecting construction, commissioning, and operations teams in one digital ecosystem.

Decision Making

Enable management teams to make informed decisions based on real-time project intelligence.

Lifecycle Management

How Sentinel Supports the Full Commissioning Lifecycle

01

Preservation

Protect installed equipment and maintain asset integrity prior to commissioning activities.

02

Mechanical Completion

Verify all construction activities are complete and systems are ready for pre-commissioning.

03

Pre-Commissioning

Execute systematic checks and tests to prepare systems for live commissioning.

04

Commissioning

Introduce live fluids and energy, verifying systems operate as designed.

05

RFSU

Ready for Start-Up — confirm all systems meet the criteria for safe plant startup.

06

Handover

Formally transfer systems from project to operations with full documentation packages.

07

Performance Testing

Demonstrate plant performance against contractual and design guarantees.

08

Project Close Out

Complete all outstanding items, archive records, and formally close the project.

Industrial construction site pipeline engineering

System-Based Approach

Industry Best Practice

Architecture

System & Sub-System Driven Completion

Sentinel adopts a System and Sub-System driven approach that aligns with industry best practices for completion and commissioning management. Instead of tracking activities through disconnected spreadsheets, project teams can monitor readiness, progress, and completion status at the system level, ensuring that critical paths are clearly identified and prioritized. This approach enables a controlled transition from construction completion to safe and efficient plant startup.

  • System & Sub-System tracking
  • Real-time readiness dashboards
  • Critical path identification
  • Controlled construction-to-startup transition
Project Delivery
"From Mechanical Completion to Operational Readiness — Sentinel provides the visibility, control, and confidence required to deliver successful commissioning outcomes."